<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Powerco™ Canada Inc.</title>
	<atom:link href="http://www.powerco.ca/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.powerco.ca</link>
	<description>The Power in your Business is Our Business</description>
	<lastBuildDate>Wed, 11 Apr 2012 21:07:27 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3</generator>
		<item>
		<title>High Resistance Grounding / Arc Flash Protection Seminar April 23 to 25th (Vancouver, Calgary &amp; Edmonton)</title>
		<link>http://www.powerco.ca/2012-tecnical-seminar-series-april-23-to-25th-vancouver-calgary-edmonton/</link>
		<comments>http://www.powerco.ca/2012-tecnical-seminar-series-april-23-to-25th-vancouver-calgary-edmonton/#comments</comments>
		<pubDate>Sat, 31 Mar 2012 00:38:49 +0000</pubDate>
		<dc:creator>site-admin</dc:creator>
				<category><![CDATA[Announcements]]></category>
		<category><![CDATA[Events]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.powerco.ca/?p=339</guid>
		<description><![CDATA[Powerco&#8482; will be hosting the first event in our 2012 Technical seminars April 23rd, 24th and 25th in Vanouver BC, Calgary AB and Edmonton AB. IGARD Seminar Invitation 2012 Resistance Grounding Techniques and Arc Flash Relay Technology (presented by I-GARD &#8230; <a href="http://www.powerco.ca/2012-tecnical-seminar-series-april-23-to-25th-vancouver-calgary-edmonton/">Continue reading <span class="meta-nav">&#9656;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Powerco&trade; will be hosting the first event in our 2012 Technical seminars April 23rd, 24th and 25th in Vanouver BC, Calgary AB and Edmonton AB. <strong><a href="http://www.powerco.ca/wp/wp-content/uploads/2012/03/IGARD-Seminar-Invitation-2012.pdf">IGARD Seminar Invitation 2012</a></strong></p>
<p><a title="Contact Us" href="http://www.powerco.ca/contact-us/" target="_blank"><em><strong>Resistance Grounding Techniques and Arc Flash Relay Technology </strong></em></a>(presented by<a href="http://http://www.i-gard.com" target="_blank"> I-GARD Corp</a>). To sign up or for more information, please contact us (info@powerco.ca).</p>
<h5>Seminar Topics will include::</h5>
<h4><strong><span style="text-decoration: underline;"> Understanding Grounding Technique</span>s</strong></h4>
<ul>
<li>
<h5><strong>Ungrounded</strong></h5>
</li>
<li>
<h5><strong>Solidly Grounded</strong></h5>
</li>
<li>
<h5><strong>Resistance Grounding (High and Low)</strong></h5>
</li>
<li>
<h5><strong>Ground Fault relay systems</strong></h5>
</li>
<li>
<h5><strong>Second Fault Protection Schemes</strong></h5>
</li>
</ul>
<h4><span style="text-decoration: underline;"><strong> Arc Flash Reduction Through Protective Relays</strong></span></h4>
<ul>
<li>
<h5><strong></strong><strong>New Technologies</strong><strong></strong></h5>
</li>
<li>
<h5><strong>Installation and Design of protection systems</strong></h5>
</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.powerco.ca/2012-tecnical-seminar-series-april-23-to-25th-vancouver-calgary-edmonton/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Performance and Price Considerations for Harmonic Filtering Solutions</title>
		<link>http://www.powerco.ca/performance-and-price-considerations-for-harmonic-filtering-solutions/</link>
		<comments>http://www.powerco.ca/performance-and-price-considerations-for-harmonic-filtering-solutions/#comments</comments>
		<pubDate>Wed, 02 Nov 2011 21:36:59 +0000</pubDate>
		<dc:creator>site-admin</dc:creator>
				<category><![CDATA[Latest Tech Documents]]></category>

		<guid isPermaLink="false">http://powerco.ca/wp/?p=33</guid>
		<description><![CDATA[Problems associated with harmonic distortion are well understood for many power system applications. However, finding the right solution is challenging. There are at least ten different technologies to choose from, each with specific technical and economic advantages. This paper will &#8230; <a href="http://www.powerco.ca/performance-and-price-considerations-for-harmonic-filtering-solutions/">Continue reading <span class="meta-nav">&#9656;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Problems associated with harmonic distortion are well understood for many power system applications. However, finding the right solution is challenging.</p>
<p>There are at least ten different technologies to choose from, each with specific technical and economic advantages. This paper will provide recommendations for reducing harmonic distortion, improving system capacity and improving system reliability while evaluating economic considerations.</p>
<p>This paper will provide recommendations for reducing harmonic distortion, improving system capacity and improving system reliability while evaluating economic considerations.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.powerco.ca/performance-and-price-considerations-for-harmonic-filtering-solutions/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>NEW Surge Protection Device Standards (UL1449 3rd Edition)</title>
		<link>http://www.powerco.ca/new-ul1449-spd-standards-2nd-and-3rd-edition/</link>
		<comments>http://www.powerco.ca/new-ul1449-spd-standards-2nd-and-3rd-edition/#comments</comments>
		<pubDate>Wed, 02 Nov 2011 15:35:24 +0000</pubDate>
		<dc:creator>site-admin</dc:creator>
				<category><![CDATA[Latest Tech Documents]]></category>

		<guid isPermaLink="false">http://powerco.ca/wp/?p=30</guid>
		<description><![CDATA[The primary safety standard for surge protective devices (SPD&#8217;s), also called transient voltage surge suppressors (TVSS) has undergone some major revisions in the past 3 years. This document will describe the major differences between UL 1449 2nd Edition and UL &#8230; <a href="http://www.powerco.ca/new-ul1449-spd-standards-2nd-and-3rd-edition/">Continue reading <span class="meta-nav">&#9656;</span></a>]]></description>
			<content:encoded><![CDATA[<p>The primary safety standard for surge protective devices (SPD&#8217;s), also called transient voltage surge suppressors (TVSS) has undergone some major revisions in the past 3 years.</p>
<p>This document will describe the major differences between UL 1449 2nd Edition and UL 1449 3rd Edition. Compliance to this standard is mandated by September 2009.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.powerco.ca/new-ul1449-spd-standards-2nd-and-3rd-edition/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Powerco Offers IEEE 519 Compliance Solutions</title>
		<link>http://www.powerco.ca/powerco-offers-ieee-519-compliance-solutions/</link>
		<comments>http://www.powerco.ca/powerco-offers-ieee-519-compliance-solutions/#comments</comments>
		<pubDate>Sun, 02 Oct 2011 00:26:54 +0000</pubDate>
		<dc:creator>site-admin</dc:creator>
				<category><![CDATA[Announcements]]></category>

		<guid isPermaLink="false">http://powerco.ca/wp/?p=23</guid>
		<description><![CDATA[The recent increase in the enforcement of IEEE 519 compliance standards by utility companies in Western Canada has caused much confusion among design engineers and contractors. The rules being applied by several utilities have been part of the connection contract &#8230; <a href="http://www.powerco.ca/powerco-offers-ieee-519-compliance-solutions/">Continue reading <span class="meta-nav">&#9656;</span></a>]]></description>
			<content:encoded><![CDATA[<p>The recent increase in the enforcement of IEEE 519 compliance standards by utility companies in Western Canada has caused much confusion among design engineers and contractors.</p>
<p>The rules being applied by several utilities have been part of the connection contract for many years, however the proliferation of non-linear loads has caused a more stringent policing of end user distortion levels regarding harmonic emissions and compliance with Telephone Influence standards.</p>
<p>Powerco&trade; is pleased to offer our expertise in this area through distribution system modelling as well as the provision and commissioning of both passive and active harmonic mitigation systems.</p>
<p>With the Powerco&trade; experience and expertise in harmonic mitigation, we can assure your compliance to IEEE 519 and utility standards for new connection.</p>
<p><strong>Call us today for a review of your Harmonic suppression needs.</strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.powerco.ca/powerco-offers-ieee-519-compliance-solutions/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

